1. Delivery of post-use PVC-Flooring
2. Sorting separation of non-PVC materials which were missed in Collecting Points
3. Coarse Breaking to chips < 3 cm
4. Removal of Metal iron metals, nails etc. by a magnet
5.Cleaning of the chips removal of mortar and clue in a hammer mill, „dry washing machine“
6. Separation of Waste sieving to remove unwanted materials
7. Fine Grinding – as a result of a cooling process to -40°C the chips become temporarily brittle and can further ground to particles < than 0,4 mm
8. Classification separation of PET-fibres (small ball) resulting from the grinding process
9. Packaging into Big Bags
10. Dispatch to the flooring producers: production of new PVC building products